Site plan

Permit guide

Site plan for a permit in Arvada, CO

What Arvada's own pages say about sheds, decks and the site plan that goes with the permit, quoted word for word with a link to each page. Then type your address and draw yours to scale for $29.

Can you use our sheet here?

Arvada accepts a simple plot plan in many cases, and an owner may draw one for a fence. Our sheet cannot replace an Improvement Location Certificate or survey where the city requires one. Additions and structures over 600 square feet or with eaves over 10 feet commonly need stamped building drawings, separate from the plot plan.

Do you need a permit for a shed in Arvada?

Arvada says any structure built on a property, attached or detached, needs a permit, and its Residential Exterior list names detached pergolas, gazebos and accessory structures over 120 square feet. None of the pages we read says a smaller shed is exempt, so write to the building permits office before you build one under 120 square feet without a permit. A detached deck needs no permit if it is under 200 square feet, less than 30 inches above grade, not attached to the house and not serving a required exit door. Attached decks, patio covers, pergolas, garages and additions all need one. Every fence needs a permit, whatever its height.

What an Arvada plot plan should carry

Arvada's plot plan shows the property lines and lot dimensions, the house, every existing and proposed accessory structure labelled as existing or proposed and by its use, the size and position of the new work, and the distances from each structure to the property lines and to nearby structures, measured from the face of the new structure. For a fence, it shows the fence's distance to each property line, the address and the north direction. Paper plans dropped off at City Hall are scanned by staff, who cannot scan anything larger than 11 by 17 inches; our sheet is 11 by 17. Our sheet draws the lot from the county's parcel record, to scale, with each side's length, a north arrow and the distances from what you place to each lot line, measured to the face of what you place.

Who can draw it

Arvada says a simple hand-drawn plot plan is acceptable in many cases if it is clear and accurate, and its fence page says the owner may draw the plot plan on the city's form instead of hiring a company for an Improvement Location Certificate. The Residential Exterior page also says that in some situations the city may require an Improvement Location Certificate or a survey from a licensed surveyor; our sheet cannot stand in for either. Stamped plans from a Colorado architect or engineer are commonly required for the construction drawings of structures over 600 square feet or with eaves over 10 feet, and for additions; that applies to the building plans, not the plot plan. An owner who lives in the house needs no contractor license.

How to file

Apply through the city's eTRAKiT permit system and upload every document as a PDF. Hand-drawn plans can be dropped off at City Hall for scanning. Planning staff review the site plan first; only after Planning approves does the application go to Building for review.

What needs a permit in Arvada

Arvada's Residential Exterior page says any structure built on a property, attached or detached, needs a permit.

“Permits are required for any structure (attached or detached) being constructed on a property.”

The city's page, read November 19, 2026

Its list names detached pergolas, gazebos and accessory structures over 120 square feet. None of the pages we read says a smaller shed is exempt.

“Detached pergolas, gazebos and accessory structures over 120 square feet”

The city's page, read November 19, 2026

A detached deck needs no permit if it is under 200 square feet, less than 30 inches above grade and does not serve a required exit door.

“Detached Decks (Decks under 200 sf, not attached to the structure, less than 30ā€ to grade and not serving a required exit door does not require a permit)”

The city's page, read November 19, 2026

Every fence needs a permit, whatever its height.

“Permits are required for all fencing in the City of Arvada, regardless of height.”

The city's page, read November 19, 2026

What the site plan must show

The plot plan shows the property lines and the lot's dimensions.

“Property lines and lot dimensions”

The city's page, read November 19, 2026

It shows the distances between the structures and the property lines.

“Distances/ setbacks between structures and property lines”

The city's page, read November 19, 2026

Setbacks are measured from the face of the new structure.

“All setbacks should be measured from the face of the proposed structure or addition to the nearby property lines and other structures on the lot”

The city's page, read November 19, 2026

Each accessory structure is labelled as existing or proposed and by its use.

“Accessory structures should be clearly labeled as existing or proposed and identified by use (garage, shed, deck, ADU, patio cover, etc.).”

The city's page, read November 19, 2026

Who may draw the plan

A simple hand-drawn plot plan is often accepted. In some cases the city may require an Improvement Location Certificate or a survey from a licensed surveyor.

“In many cases, a simple hand-drawn plot plan is acceptable if it is clear and accurate. In some situations, an Improvement Location Certificate (ILC) or property survey prepared by a licensed surveyor may be required.”

The city's page, read November 19, 2026

For a fence, the owner may draw the plot plan on the city's form instead of hiring a company for an ILC.

“If there is no plot plan you can get an ILC on your property by hiring a 3rd party company or a Plot Plan Can Be Created (PDF) by you.”

The city's page, read November 19, 2026

The city's plot plan form is offered for simple site plans; any site plan with the required information may be filed instead.

“For simple site plans this sheet is provide for convenience. Other site plans containing all required information may be submitted.”

The city's page, read November 19, 2026

Stamped plans from a Colorado architect or engineer are commonly required for construction plans of larger structures and additions, not for the plot plan.

“Structures over 600 square feet or over 10-foot eave height”

The city's page, read November 19, 2026

An owner who lives in the house needs no contractor license.

“You do not need a contractor license if you own and live in your home.”

The city's page, read November 19, 2026

Sheet size

Plans dropped off on paper are scanned by city staff, who cannot scan anything larger than 11 by 17 inches.

“City staff cannot scan plans larger than 11ā€ x 17ā€”

The city's page, read November 19, 2026

Where to file

Planning staff review the site plan first, then the application goes to Building.

“Once your completed application and plan sets have been submitted, our Planning staff will review the site plan to confirm that the proposed structure and location meet approval requirements.”

The city's page, read November 19, 2026

Documents are uploaded as PDF files with the application.

“All documents must be uploaded electronically in PDF format during the permit application process.”

The city's page, read November 19, 2026

Before you file

Lot lines are drawn from county GIS records. This is not a boundary survey. Some permit offices require a stamped plan or a survey. Check with yours first. The permit office is City of Arvada Building Permits. Rules change: the quotes above are what the city's pages said on November 19, 2026.

Draw your Arvada site plan