Site plan for a permit in Charlotte, NC

What Charlotte's own pages say about sheds, decks and the site plan that goes with the permit, quoted word for word with a link to each page. Then type your address and draw yours to scale for $29.

Can you use our sheet here?

Charlotte accepts a hand-drawn, to-scale plot plan for a shed, deck or addition. An ADU or a two-story garage needs a professionally prepared site plan. A lot whose drainage needs storm pipes or other infrastructure needs sealed drainage plans. Our sheet is not a survey.

Do you need a permit for a shed, deck or addition in Charlotte?

Two offices are involved. Mecklenburg County issues the building permit. The City of Charlotte reviews zoning, stormwater and trees in a separate application called an Individual Residential Lot (LDIRL) review. A detached shed, garage or other structure more than 12 feet in any dimension, an addition, a deck, a pool or a retaining wall goes through both. A detached structure under 12 feet in every dimension is on the city's zoning-review list instead. The city's guide says fences and walls need no permit, though they still have to follow the zoning ordinance. Whether a small shed needs a county building permit is the county's rule; the county's pages refused our connection, so we do not state its size limit here. Check it at meckpermit.com before you build.

Plot plan or site plan

Charlotte's zoning checklist asks for one of two drawings, depending on the project. A plot plan is enough for an addition, an attached or detached deck, a one-story garage, a shed or other detached structure, a pool and a retaining wall. A one-story garage or shed also needs the city's building height form and the accessory structure declaration. A site plan is required for an accessory dwelling unit (ADU), an ADU with a garage, and a two-story garage, and the city says a site plan must be professionally prepared and cannot be hand drawn. Our sheet is a plot plan. If you are building an ADU or a two-story garage in Charlotte, you need a design professional or a surveyor instead.

What the plot plan should show

The city's plot plan form asks for the streets and rights-of-way, the property lines with their lengths, every building on the lot with its porches, decks and garages, and the distance from each building to the property lines and to other structures. The stormwater checklist for LDIRL reviews adds the address and parcel number, easements, the lot area, the area of ground you will disturb, and arrows showing which way surface water runs; it says arrows over the city's GIS contours are enough at a minimum. The same checklist keeps buildings, additions, sheds, pools and retaining walls at least 7.5 feet from the centerline of a storm drain pipe that carries water from a public street, and 10 feet from the centerline of such a ditch or swale. Our sheet draws the lot from the county's parcel record, to scale, with each side's length, the lot area, the north arrow and the distances from what you place to each lot line. You add the drainage arrows, any easement and any storm pipe you know of.

Who can draw it

For the projects that need a plot plan, the city says in writing that it can be hand drawn as long as it is to scale, and its form asks the applicant to draw it, from a survey if one is available. Two cases need a licensed professional instead: an ADU or a two-story garage, which need a professionally prepared site plan, and a lot where the stormwater reviewer finds that drainage needs pipes or other storm infrastructure, which needs sealed plans. The city says that second case is typically drainage from half an acre or more. On a lot under the post-construction stormwater rules (PCSR) or the water supply watershed rules, the checklist also requires a sealed as-built survey of the built-upon area, after you build and before occupancy is released. A lot with a recorded flood protection elevation or a stream buffer also has its own requirements on the checklist; read it before you file. Our sheet is not a survey.

What needs a permit in Charlotte

Detached accessory structures more than 12 feet in any dimension, additions, decks, pools and retaining walls need a city Individual Residential Lot (LDIRL) review on top of the county building permit.

“Single Family Detached Dwelling, Duplex/Duet/Two Unit Townhome Dwelling, Manufactured Homes, ADU (Accessory Dwelling Unit), Garage with ADU, Detached Accessory Structure (greater than 12 feet in any dimension), Addition, Pool, Retaining Wall, Deck, Solar Panel, Dock/Pier.”

The city's page, read November 19, 2026

A detached accessory structure smaller than that sits on a different city list: a zoning review once any other approvals are in.

“Zoning Verification Letter, Detached Accessory Structure (less than 12 feet in any dimension), ABC Inspection.”

The city's page, read November 19, 2026

The city's residential permit guide says fences and walls need no permit, and points to the zoning ordinance for the fence rules.

“Fence and walls: permit not needed. Refer to UDO Article 17D.”

The city's page, read November 19, 2026

What the site plan must show

The city's plot plan form asks for the streets and rights-of-way.

“Draw street(s) and right-of-way(s)”

The city's page, read November 19, 2026

Property lines with their lengths.

“Draw property lines with dimensions.”

The city's page, read November 19, 2026

Every building, new and existing, with its porches, decks and garages.

“Draw proposed and existing buildings showing any attached porch(es), deck(s), chimney(s), carport(s) or garage(s), etc…”

The city's page, read November 19, 2026

The distance from each building to the property lines and to other structures.

“Show distances of buildings from property lines or other structures.”

The city's page, read November 19, 2026

The city's LDIRL plan checklist adds the address and the parcel number.

“Property Address and Parcel Identification Number”

The city's page, read November 19, 2026

Existing easements and structures.

“Existing easements and structures on the property”

The city's page, read November 19, 2026

The lot area.

“Area of property by square footage or acreage”

The city's page, read November 19, 2026

The area of ground you will disturb.

“Proposed Land Disturbance (acreage or square foot)”

The city's page, read November 19, 2026

Which way surface water runs across the lot. Arrows drawn over the city's GIS contours are enough at a minimum.

“At a minimum, GIS topography and flow arrows can be used to show direction of flow.”

The city's page, read November 19, 2026

Who may draw the plan

Charlotte's zoning checklist says a plot plan may be hand drawn, as long as it is to scale.

“A Plot Plan is a scaled plan; can be hand drawn but must be to scale; can also be a professionally prepared plan or survey”

The city's page, read November 19, 2026

A site plan, which the same checklist asks for with an ADU or a two-story garage, must be professionally prepared and cannot be hand drawn.

“A Site Plan is a scaled professionally prepared plan or survey; cannot be hand drawn”

The city's page, read November 19, 2026

The plot plan form itself asks the applicant to draw the plan, working from a survey if there is one.

“In the space provided, draw plot plan as neatly and accurately as possible, from survey if available.”

The city's page, read November 19, 2026

Where the lot's drainage needs storm pipes or similar work, the city wants sealed plans from a licensed professional; it says that is typically drainage from half an acre or more.

“Major drainage routing (storm drainage infrastructure required) requires sealed calculations and detailed grading/drainage plans from an appropriate licensed professional.”

The city's page, read November 19, 2026

On a lot under the post-construction stormwater rules (PCSR) or the water supply watershed rules, the checklist makes a sealed as-built survey of the built-upon area a condition of release before occupancy.

“Sealed BUA As-built Survey is required to be submitted for review and approval”

The city's page, read November 19, 2026

Where to file

The building permit is a Mecklenburg County application.

“Projects like these typically require a building permit(s) application at Mecklenburg County (www.meckpermit.com).”

The city's page, read November 19, 2026

The city's LDIRL review is a separate application in the city's Accela system.

“A separate application is required for a land development Individual Residential Lot (LDIRL) project in the City of Charlotte’s Accela Permit system (https://aca-prod.accela.com/CHARLOTTE/) for review and approval.”

The city's page, read November 19, 2026

The two can run at the same time.

“These can be submitted and reviewed prior to or concurrently with Mecklenburg County Land Use and Environmental Services Agency (LUESA) Residential Plan reviews.”

The city's page, read November 19, 2026

Before you file

Lot lines are drawn from county GIS records. This is not a boundary survey. Some permit offices require a stamped plan or a survey. Check with yours first. The permit office is City of Charlotte Zoning, with Mecklenburg County for the building permit. Rules change: the quotes above are what the city's pages said on November 19, 2026.

Draw your Charlotte site plan