Site plan

Permit guide

Site plan for a permit in Dallas, TX

What Dallas's own pages say about sheds, decks and the site plan that goes with the permit, quoted word for word with a link to each page. Then type your address and draw yours to scale for $29.

Can you use our sheet here?

Dallas's pages do not say who must draw the site plan, and none asks for a survey with it. A homeowner may pull the permit for a fence or portable building, not a permanent detached building or an addition; an addition's permit goes only to a registered contractor and needs a surveyor's form board survey before the foundation inspection.

Do you need a permit for a shed in Dallas?

Size and utilities decide it. A storage building under 200 square feet with no electricity or plumbing needs no building permit on a house or duplex lot, and neither does a deck no more than 30 inches off the ground or a carport of 200 square feet or less. Those exemptions do not apply in historic, conservation or planned development districts, which have their own rules. A fence needs a permit once it is taller than 4 feet in the front yard or 6 feet elsewhere. Anything larger, and any addition to the house, needs a permit, and the permit needs a site plan.

Where a shed or carport can go

Dallas's FAQ says the yards next to your lot lines must stay open except for fences, and that the distances depend on your zoning district. Detached carports count as accessory structures: in the rear, 30 percent of the lot can be built up to the side and rear property lines, except that an alley needs 3 feet. The building code asks for a fire-rated wall closer than 5 feet, so the FAQ suggests 5 feet unless the carport is all metal. Your plat may show building lines too; the certified plat from the county records office is the place to check.

What a Dallas site plan should carry

The checklist for a home addition asks for the lot, block and address, a standard scale with every dimension, a north arrow, every property line with its length, building lines and easements, and the outline of every structure with its front, side and rear setbacks. It also asks for a certified copy of the county plat. A fence plan shows the fence line, gates, easements, driveways, sidewalks, alleys and curbs. Our sheet draws the lot from the county's parcel record, to scale, with each side's length, the north arrow and the distances from what you place to each lot line. You add the legal description from your deed or plat, easements and building lines from the plat, and the driveway.

Who can draw it

None of the Dallas pages we read says who must draw the site plan, and none asks for a survey with it. The building FAQ says a homeowner may do general building work on their own property once permitted. Two limits apply. The homeowner's permit covers fences, portable accessory buildings and patio covers, but not a permanent detached building or an addition, and the addition checklist says its permits are issued only to a registered contractor. And for an addition, a form board survey from a surveyor goes to the inspector before the foundation inspection. Plan for both before you file.

What needs a permit in Dallas

Dallas needs a permit before most building work on a structure.

“A person, firm or corporation shall not erect, construct, enlarge, add to, alter, repair, replace, improve, remove, install, convert, equip, use, occupy or maintain a structure or building service equipment without first obtaining a MASTER PERMIT from the building official.”

The city's page, read November 19, 2026

A fence needs a permit once it is over 4 feet in the front yard or over 6 feet anywhere else.

“A Fence Permit is required to erect a fence that is over four feet high in a front yard, or over six feet high elsewhere.”

The city's page, read November 19, 2026

Sheds that need no building permit

A storage building under 200 square feet with no utilities needs no permit, outside historic, conservation and planned development districts.

“Erection of utility buildings with floor area of less than 200 square feet, without utilities, on single-family or duplex premises”

The city's page, read November 19, 2026

Those exemptions do not hold in the special districts.

“NO PERMIT is required for the following except in certain areas such as historic districts, conservation districts and planned development districts that have additional requirements.”

The city's page, read November 19, 2026

A low deck needs no permit either.

“Construction of decks, platforms, walks, or driveways not more than 30 inches above grade and not over any basement or story on single-family or duplex premises”

The city's page, read November 19, 2026

What the site plan must show

Dallas's checklist for a home addition lists what its site plan carries: the legal description,

“Legal description on site plans (lot, block, and address)”

The city's page, read November 19, 2026

a standard scale with every dimension,

“Drawn to a standard scale and completely dimensioned plans.”

The city's page, read November 19, 2026

a north arrow,

“North arrow and/or plan North.”

The city's page, read November 19, 2026

every property line with its length, the building lines and the easements,

“Indicate length, metes, bounds, building lines and easements.”

The city's page, read November 19, 2026

and the outline of every structure with its front, side and rear setbacks.

“Label footprint (outline) of all structures including all projections beyond the foundation line, showing placement on the property and front, side, and rear yard setbacks.”

The city's page, read November 19, 2026

The same checklist asks for a certified copy of the county plat with the application.

“Certified County plat required”

The city's page, read November 19, 2026

For a fence, the site plan is drawn to scale and shows where the fence runs.

“Two copies of site plan drawn to a standard scale providing symbols showing the location of the fence or wall,”

The city's page, read November 19, 2026

Who may draw the plan

None of the pages we read says who must draw the site plan. The building FAQ lets a homeowner do general building work on their own property once permitted.

“A homeowner may perform general building work on their own property after obtaining all of the proper permits.”

The city's page, read November 19, 2026

The homeowner's permit does not cover a permanent detached accessory building, nor an addition to the house.

“The Homeowner’s Permit does not allow a homeowner to: • build a swimming pool • build a permanent detached accessory building • add on to an existing home”

The city's page, read November 19, 2026

For an addition, a surveyor's form board survey goes to the inspector before the foundation inspection. That comes after the permit, not with the site plan.

“A form board survey is required prior to foundation inspection. Submit to the building inspector.”

The city's page, read November 19, 2026

Sheet size

Sheets may be no larger than 36 by 48 inches, with text at least 3/32 inch tall.

“All drawing documents submitted for review must be legible, drawn to a standard scale, have a minimum text size of 3/32” and up to a maximum drawing sheet size of 36” x 48”, “E” size.”

The city's page, read November 19, 2026

Where to file

Applications go in through DallasNow, the city's online permit portal.

“DallasNow is an online portal used by the City of Dallas for all of our permitting services.”

The city's page, read November 19, 2026

Before you file

Lot lines are drawn from county GIS records. This is not a boundary survey. Some permit offices require a stamped plan or a survey. Check with yours first. The permit office is City of Dallas Planning & Development, Permitting & Inspections. Rules change: the quotes above are what the city's pages said on November 19, 2026.

Draw your Dallas site plan