Site plan for a permit in El Paso, TX

What El Paso's own pages say about sheds, decks and the site plan that goes with the permit, quoted word for word with a link to each page. Then type your address and draw yours to scale for $29.

Can you use our sheet here?

El Paso's pages do not say who must draw a site plan, none asks for a survey, and an owner may apply. A seal is required for commercial and public buildings and for buildings of three stories or more.

Do you need a permit for a shed in El Paso?

Size and placement decide it. One shed per lot needs no permit if it is one story, sits in the rear yard, is under 200 square feet and stands at least 5 feet from any other structure, eave to eave. A second shed, a larger one, or one outside the rear yard needs a permit, and so does an addition. A masonry wall or fence up to 42 inches high, or a chain link or wrought iron fence up to six feet, needs no permit if it stays inside your property and meets zoning. The list of exempt work does not mention decks.

Where a shed can go

El Paso's planning FAQ says accessory buildings must meet Section 20.10.030 of the zoning code, which we did not read, so this page gives no setback numbers. The permit exemption itself already asks for the rear yard and 5 feet from other structures. Drawing the shed on the lot shows the reviewer, and you, how far it sits from each lot line.

What an El Paso site plan should carry

None of the El Paso pages we read lists what a residential site plan must show. The building permit application has the applicant certify that the site plan is true and shows every known easement, and the code asks the application to say how the uncovered part of the lot will be used. Our sheet draws the lot from the county's parcel record, to scale, with each side's length, the lot area, the north arrow and the distances from what you place to each lot line. You add the structure, the existing buildings and any easements.

Who can draw it

El Paso's pages do not say who must draw a site plan, and none of the pages we read asks for a survey. The code requires an architect's or engineer's seal for commercial and public buildings, for buildings of three stories or more, and for buildings of 5,000 square feet or more other than group R-3; for other work the applicant certifies that state law lets someone who is not registered prepare it. An owner may apply for the permit.

What needs a permit in El Paso

El Paso's Planning and Inspections page says building, enlarging, altering or moving any building or structure needs a permit.

“A permit is required to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure within the City of El Paso's jurisdiction.”

The city's page, read November 19, 2026

The city's residential code amendments exempt a masonry wall or fence up to 42 inches high that stays inside the property and meets zoning.

“Masonry landscape walls and fences not over forty-two inches high, completely within the subject property and meeting zoning requirements.”

The city's page, read November 19, 2026

A chain link or wrought iron fence up to six feet high, inside the property and meeting zoning, needs no permit either.

“Chain link or wrought iron fences not over six feet high, completely within the subject property and meeting zoning requirements.”

The city's page, read November 19, 2026

The same list exempts concrete walks and slabs on the ground up to 30 inches above grade. It does not mention decks, so ask before you build one without a permit.

“Concrete walks, slabs on grade and driveways not more than thirty inches above grade, that are not over a basement or story below; and that will not serve as foundation or structural support for future construction, and are not located in public right-of-way.”

The city's page, read November 19, 2026

Sheds that need no building permit

One shed per lot needs no permit if it is one story, in the rear yard, under 200 square feet and at least 5 feet from any other structure, measured eave to eave.

“One-story detached accessory storage building, canopy or structure, located in the rear yard, less than two hundred square feet in floor area and not within 5 feet of another structure, eave to eave. This exemption shall be restricted to only one accessory building within a site.”

The city's page, read November 19, 2026

What the site plan must show

The city's building permit application (form dated April 2018) has the applicant certify the site plan and that it shows every known easement. None of the pages we read lists what else a residential site plan must carry.

“I also hereby certify that the information on the site plan is true and correct and that all known easements have been properly shown.”

The city's page, read November 19, 2026

The code asks the application to describe the work and where it goes on the lot, including the part of the lot the building does not cover.

“The building permit application shall indicate the proposed occupancy of all parts of the building and of that portion of the site or lot, if any, not covered by the building or structure”

The city's page, read November 19, 2026

Who may draw the plan

None of the pages we read says who must draw the site plan, and none asks for a survey. The code's list of work that needs an architect's or engineer's seal covers commercial and public buildings, buildings of three stories or more, and buildings of 5,000 square feet or more other than group R-3.

“All buildings and structures, five thousand square feet or more in area, excluding group R-3 occupancies.”

The city's page, read November 19, 2026

For work outside that list, the applicant certifies on the submittal that state law lets someone who is not a registered professional prepare it.

“For all other buildings and structures, the submittal shall bear the certification of the applicant that some specific state law exception permits its preparation by a person not so registered.”

The city's page, read November 19, 2026

An owner may apply for the permit.

“Any owner, authorized agent or contractor who desires to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure”

The city's page, read November 19, 2026

An owner doing the work on the home they claim as their homestead needs no contractor's bond.

“Residential property owners doing all the construction work or who will be hiring workers without employing a licensed contractor to perform the construction work on the residence they claim as their homestead.”

The city's page, read November 19, 2026

Where to file

Plans can be filed electronically through the city's Citizen Access Portal.

“How do I submit plans electronically? Visit the Citizen Access Portal.”

The city's page, read November 19, 2026

Paper plans go in the drop bins outside the One-Stop Shop at 811 Texas Avenue.

“Utilize the bins provided outside the One-Stop Shop located at 811 Texas Ave.”

The city's page, read November 19, 2026

Before you file

Lot lines are drawn from county GIS records. This is not a boundary survey. Some permit offices require a stamped plan or a survey. Check with yours first. The permit office is City of El Paso Planning and Inspections Department, One-Stop Shop. Rules change: the quotes above are what the city's pages said on November 19, 2026.