Site plan

Permit guide

Site plan for a permit in Fort Worth, TX

What Fort Worth's own pages say about sheds, decks and the site plan that goes with the permit, quoted word for word with a link to each page. Then type your address and draw yours to scale for $29.

Can you use our sheet here?

Fort Worth accepts a survey or a site plan, none of its pages we read says who must draw it, and an owner living there may apply under a homestead permit. Engineered drawings are separate: metal buildings, buildings on existing foundations, garages over 499 square feet tied into the house, and foundation plans for additions over 500 square feet.

Do you need a permit for a shed in Fort Worth?

Yes. Fort Worth has no small-shed exemption on its residential permit pages: every storage building needs a building permit, and so does every detached garage, carport and addition. A deck needs one once it stands more than 6 inches off the ground. A fence needs one only when it is tall: over 7 feet for a solid fence, over 8 feet for an open one. In the front yard a fence can be no taller than 4 feet and must be an open design.

How big a shed can be, and where it can go

The city's accessory-building packet ties the largest shed or workshop allowed to the size of the lot: 120 square feet on a lot of 5,000 square feet or less, 200 square feet on a lot up to 9,999, 400 square feet on a lot from 10,000 up to just under an acre, and 2 percent of the lot area on an acre or more. A shed cannot go in the front yard or in an easement. It must sit behind the back wall of the house or at least 75 feet from the front property line, whichever is less strict. Its distance from the rear and side lot lines grows with its height: 5 feet for a building up to 10 feet tall, 7 feet at 11 feet, and 9 feet at 12 feet, the tallest allowed without a variance. Corner lots have their own setbacks, so check the zoning ordinance for your district before you fix the spot.

What a Fort Worth site plan should carry

For a shed, garage, carport or addition, Fort Worth asks for a survey or a site plan that shows the front, side and rear setbacks with their distances, the front setbacks of the neighboring houses, the lot lines and easements with their lengths, a north arrow and a scale. It also asks for a copy of your lot's recorded plat, a public record you can look up in the Tarrant County online plat search. Our sheet draws the lot from the county's parcel record, to scale, with each side's length, the north arrow, the scale and the distances from what you place to each lot line. The packet requires the front setbacks of the neighboring houses, with their distances, as well; our sheet does not draw them, so add them yourself, along with the easements from your plat.

Who can draw it

Fort Worth's packet accepts a survey or a site plan, and none of the pages we read says who must draw the site plan. An owner who lives in the house as a primary residence can apply under a homestead permit instead of hiring a registered contractor. Separate from the site plan, the construction drawings for some accessory buildings must be engineered: metal buildings, buildings on an existing foundation, and garages over 499 square feet tied into the house's foundation. For an addition over 500 square feet, the foundation plan must be sealed by an engineer. If your project is one of those, plan for an engineer's drawings as well as the site plan.

What needs a permit in Fort Worth

Every storage building needs a building permit in Fort Worth, whatever its size.

“All storage buildings require a building permit. There are additional zoning requirements associated with the location, maximum height and square footage, depending upon your lot size.”

The city's page, read November 19, 2026

A deck needs a permit once it stands more than 6 inches off the ground.

“All platforms, walks and decks over 6” above grade require a building permit.”

The city's page, read November 19, 2026

A fence needs a permit only when it is tall: over 7 feet if solid, over 8 feet if open.

“Building permits are required for solid fences with a height above 7 feet and for open fences with a height above 8 feet.”

The city's page, read November 19, 2026

Additions always need a permit.

“All additions require building permits.”

The city's page, read November 19, 2026

The same goes for detached garages.

“All detached garages require building permits.”

The city's page, read November 19, 2026

What the site plan must show

The accessory-building packet asks for a survey or a site plan, and lists what it must show.

“2. SURVEY OR SITE PLAN. Must show the following:”

The city's page, read November 19, 2026

The front, side and rear setbacks with their distances, and the front setbacks of the houses next door.

“Front, side, & rear yard setbacks along w/ neighboring front yard setbacks with dimensions.”

The city's page, read November 19, 2026

The lot lines and easements, with their lengths.

“Lot lines and easements with dimensions.”

The city's page, read November 19, 2026

A north arrow and a scale.

“Directional north arrow and a scale.”

The city's page, read November 19, 2026

Separately from the site plan, the packet asks for a copy of the lot's recorded plat.

“1. PLAT. A copy of the property's legally registered & recorded plat from the Tarrant County Court House”

The city's page, read November 19, 2026

For an addition, the city's packet asks for the same survey-or-site-plan items.

“2. SURVEY OR SITE PLAN. Must show the following: a. Front, side, & rear yard setbacks along w/ neighboring front yard setbacks with dimensions. b. Lot lines and easements with dimensions. c. Directional north arrow and a scale.”

The city's page, read November 19, 2026

Who may draw the plan

Fort Worth takes a survey or a site plan. None of the pages we read says who must draw the site plan.

“2. SURVEY OR SITE PLAN.”

The city's page, read November 19, 2026

An owner who lives in the house as a primary residence can apply under a homestead permit instead of hiring a registered contractor.

“Permit applicants must be a registered building contractor or must meet the requirements for a homestead permit, which include working on a building owned and occupied by them solely as their primary residence”

The city's page, read November 19, 2026

Engineering is required for the construction drawings, not the site plan, of some accessory buildings: metal ones, ones built on an existing foundation, and large garages tied into the house's foundation.

“Engineering is required for the following: i. Structures built of metal ii. Structures built over existing foundations iii. Garages greater than 499 sq ft when tied into an existing foundation of a residential component”

The city's page, read November 19, 2026

For an addition over 500 square feet, the foundation plan must be sealed by an engineer. That is a construction drawing, not the site plan.

“Additions over 500 square feet, special designs, and post-tensions plans require plans sealed by an engineer.”

The city's page, read November 19, 2026

Where to file

Every residential permit can be applied for online.

“All permits may be applied for online.”

The city's page, read November 19, 2026

Before you file

Lot lines are drawn from county GIS records. This is not a boundary survey. Some permit offices require a stamped plan or a survey. Check with yours first. The permit office is City of Fort Worth Development Services. Rules change: the quotes above are what the city's pages said on November 19, 2026.

Draw your Fort Worth site plan