Site plan

Permit guide

Site plan for a permit in Indianapolis, IN

What Indianapolis's own pages say about sheds, decks and the site plan that goes with the permit, quoted word for word with a link to each page. Then type your address and draw yours to scale for $29.

Can you use our sheet here?

The city says a site plan need not be drawn by an architect, engineer or surveyor, so our sheet can serve as the plan for a shed, deck or addition if its information is accurate. On a lot in a floodway or floodplain, the plan must be certified by an engineer, land surveyor or architect.

Do you need a permit for a shed in Indianapolis?

Size decides it. A shed of 120 square feet or less, under 15 feet tall, not on a permanent foundation and with no electric or other utility connection needs no permit. From 121 to 200 square feet it needs a structural permit. Over 200 square feet it also needs an Improvement Location Permit, the zoning permit that is reviewed against the site plan. An addition needs both. A deck whose floor is nowhere more than 30 inches above the ground needs no structural permit, though the city says an Improvement Location Permit can still apply. Even a shed that needs no permit has to meet the zoning setbacks and lot coverage limits for your district, which are in the Indy Rezone ordinance.

What an Indianapolis site plan should carry

The homeowner's guide lists the items: a north arrow; the subdivision, section and lot number (or the metes and bounds description if the lot is not in a subdivision); the address; the lot and its dimensions; streets, alleys, rights-of-way and easements; every structure, existing and proposed, with its size and a label; new structures cross-hatched and anything coming down drawn in broken lines; the distance from each lot line to every structure, measured square to the line; and the driveway with its width at the street. It is drawn at 1 inch = 30 feet or larger, with the scale, address and date on the sheet. Our sheet draws the lot from the county's parcel record, to scale, with each side's length, the north arrow and the distances from what you place to each lot line. You add the subdivision and lot number, any easement you know of, the driveway width and the labels.

Who can draw it

The city's page on site plans says a site plan drawn by an architect, engineer or surveyor is not required, but the information must be accurate. A mortgage survey or the recorded plat, if you have one, is a good check on the lot lines. An owner who pulls the structural permit and does the work signs a Statement of Intent and Understanding. One exception: the city's 2021 homeowner's guide says that on a lot in a floodway or floodplain, the site plan for the drainage permit must be certified by a professional engineer, land surveyor or architect. All building in a flood hazard area also needs a floodplain development permit, so if your lot is in a flood zone, write to flood@indy.gov before you draw anything.

Filing

Applications and plans are filed online through the Citizens Access Portal, or by mail to the Department of Business and Neighborhood Services at the City-County Building. Include the Residential Plan Submittal Checklist and two sets of plans. If you are in a historic district and the work is on the outside, the Indianapolis Historic Preservation Commission must approve it first.

What needs a permit in Indianapolis

An Improvement Location Permit, the zoning permit that carries the site plan, is needed for any new structure or any added floor area or height.

“Improvement Location Permit: Required for increased square footage or height of an existing structure, proposing a new structure, and all other site improvements, unless otherwise exempt per Sec. 740-801A.”

The city's page, read November 19, 2026

The homeowner's guide sets the permits for a shed by size. Its drainage line predates the 2025 state change described on the city's drainage page.

“Between 121 square feet and 200 square feet, only a Structural and a Drainage Permit are required. Over 200 square feet, a Structural, Improvement Location and Drainage permit are required.”

The city's page, read November 19, 2026

A room addition needs an Improvement Location Permit and a structural permit, and a flood permit where one applies.

“A room addition requires an Improvement Location, Structural, and Drainage permit as well as a Flood permit if applicable.”

The city's page, read November 19, 2026

A deck whose floor is nowhere more than 30 inches above finished grade needs no structural permit, provided the assessor is notified as the code requires. The guide warns that an Improvement Location Permit can still be needed for exempt work.

“(15) Erection or installation of a deck where: a. No part of the floor is more than thirty (30) inches above finished grade; and b. There is compliance with the assessor notification requirements of section 536-215;”

The city's page, read November 19, 2026

Since May 1, 2025, a local drainage permit is needed only when the project also needs state stormwater coverage, which starts at one acre of disturbed land.

“In other words, if you don’t need CSGP coverage, you don’t need a local drainage permit.”

The city's page, read November 19, 2026

Sheds that need no building permit

A shed of 120 square feet or less, under 15 feet tall, not on a permanent foundation and with no utility connection needs no permit.

“A shed that is 120 sf or less, less than 15’ in height, and is not on a permanent foundation and has no utility connection does not require a permit.”

The city's page, read November 19, 2026

An exempt shed still has to meet the zoning setbacks and lot coverage limits for the district.

“For detached buildings and structures such as storage shed, open-air gazebos, and other accessory buildings, compliance with a property’s zoning district is required including minimum building setbacks and maximum lot coverage as applicable.”

The city's page, read November 19, 2026

What the site plan must show

The structural permit asks for a site plan to scale with every building, existing and proposed, inside the property lines, plus driveways, patios, decks and walks.

“Site plan drawn to scale showing the location of existing and proposed buildings within property boundaries, as well as driveways, patios, decks, pools, courts, walks, etc.”

The city's page, read November 19, 2026

A north arrow.

“The direction north (shown by an arrow).”

The city's page, read November 19, 2026

The subdivision, section and lot number; outside a subdivision, the metes and bounds legal description attached.

“Subdivision name, section number, and lot number. For a lot not located in a subdivision, a copy of the metes and bounds legal description must be attached to or incorporated with the plot plan.”

The city's page, read November 19, 2026

The lot and its dimensions.

“The overall site and dimensions thereof.”

The city's page, read November 19, 2026

Streets, alleys, rights-of-way and easements, named and dimensioned.

“Names, locations, and dimensions of all right-of-way, streets, alleys, and easements.”

The city's page, read November 19, 2026

Every structure, existing and proposed, with its size, and a label saying what each one is.

“Use of each structure by labeling (e.g. existing residence, proposed attached garage, pool, covered porch, deck, storage shed, etc.).”

The city's page, read November 19, 2026

New structures are cross-hatched.

“Proposed structures indicated by cross-hatching, i.e. /////.”

The city's page, read November 19, 2026

The distance from the front, rear and each side line to every structure, measured square to the line.

“Distances from front, rear, and each side property line to all structures, both proposed and existing. The distance is measured from the point where the measurement must form a right angle with the property line.”

The city's page, read November 19, 2026

The driveway and its width where it meets the street.

“Location of the proposed or existing driveway and its width at the right-of-way (property) line.”

The city's page, read November 19, 2026

An aerial photo can help you draw, but it does not replace the site plan.

“However, an aerial photograph is not acceptable in lieu of a site plan.”

The city's page, read November 19, 2026

Who may draw the plan

The city's page on site plans says no architect, engineer or surveyor is needed to draw one, as long as the information is accurate.

“A site plan drawn by an architect, engineer, or surveyor is not required. However, the information must be accurate.”

The city's page, read November 19, 2026

An owner who pulls the structural permit to do the work signs a Statement of Intent and Understanding.

“If a property owner is pulling the permit, they must complete and sign a Statement of Intent and Understanding.”

The city's page, read November 19, 2026

The exception: the 2021 homeowner's guide says that on a lot in a floodway or floodplain, the drainage site plan must be certified by a professional engineer, land surveyor or architect.

“If the lot is in a floodway or floodplain, a Professional Engineer, Land Surveyor, or Architect must certify the site plan.”

The city's page, read November 19, 2026

Sheet size

The site plan is drawn at 1 inch = 30 feet or larger; 1 inch = 40 feet is allowed for unusually large lots.

“The site plan must be drawn to a scale of 1”=30’ or larger. For unusually large lots, a scale of 1”=40’ is permissible.”

The city's page, read November 19, 2026

Every plan states its scale, the property address and the date.

“All plans must be legible and drawn to a standard engineer or architect scale. The scale, property address and date must be indicated on the plans.”

The city's page, read November 19, 2026

Where to file

Applications and plans go in online through the Citizens Access Portal, or by mail to the City-County Building.

“Payments, applications, and plan submittals must be submitted online through the Citizens Access Portal, or be mailed to our office at the City-County Building:”

The city's page, read November 19, 2026

The application includes the Residential Plan Submittal Checklist and two sets of plans, and a Statement of Intent when the owner does the work.

“A completed Statement of Intent, if work is to be completed by the property owner.”

The city's page, read November 19, 2026

Before you file

Lot lines are drawn from county GIS records. This is not a boundary survey. Some permit offices require a stamped plan or a survey. Check with yours first. The permit office is Indianapolis Department of Business and Neighborhood Services (BNS). Rules change: the quotes above are what the city's pages said on November 19, 2026.

Draw your Indianapolis site plan