Permit guide
Site plan for a permit in Mesa, AZ
What Mesa's own pages say about sheds, decks and the site plan that goes with the permit, quoted word for word with a link to each page. Then type your address and draw yours to scale for $29.
Can you use our sheet here?
For a shed, patio, fence or addition in Mesa, the city's pages do not say who must draw the plot plan and do not ask for a survey. Ask the city before you rely on that.
Do you need a permit for a shed in Mesa?
Size and utilities decide it. A detached shed or playhouse under 200 square feet with no power, plumbing or gas needs no construction permit. Over 200 square feet, or with any utility connection, it does. The city's FAQ says under 200 square feet and its Homeowners Guide says 200 square feet or less, so a shed of exactly 200 square feet is worth asking about in writing. A fence needs a permit only over 6 feet high. Even a shed that needs no permit must meet the height and placement rules, so it helps to draw it on the lot before you build.
Where a shed can go
Mesa's single-family zoning checklist says a detached structure must stand at least 5 feet from the house, from an accessory dwelling unit and from any other detached building. Setbacks from the lot lines and lot coverage depend on your zoning district: the Homeowners Guide tells you to get them from the Planner of the Day, by email at Planning.Info@mesaaz.gov, before you apply, and to check with the utility companies for easements.
What a Mesa plot plan should carry
Mesa's Homeowners Guide asks for a drawing of the lot showing the property lines on every side, every new and existing building with its distance to the property lines, the area of the lot and of each building, the utility right-of-way where there is one, and the minimum setbacks. Our sheet draws the lot from the county's parcel record, to scale, with each side's length, the lot area, the north arrow and the distances from what you place to each lot line. You add the structure, the setbacks your zone requires, easements and the right-of-way.
Who can draw it
Mesa's pages do not say who must draw a plot plan, and none of the pages we read asks for a survey for a shed, patio, fence or addition. The zoning checklist asks only that a sheet stamped by an Arizona professional show the seal legibly. The Homeowners Guide says an owner-occupied project may not need a licensed contractor and points to the state law that decides it.
What needs a permit in Mesa
Mesa's Residential Construction Homeowners Guide (March 2025) lists a detached building over 200 square feet, or one with plumbing or electrical connections, among the work that needs a building permit.
“A detached building over 200 square feet or any plumbing or electrical connections”
An addition to the house is on the same list.
“Attached addition or detached dwelling (casita)”
So are new patios and changes to existing ones.
“New patios and modifications to existing patios”
A fence needs a permit once it is over 6 feet high.
“Fences over 6 feet high”
Sheds that need no building permit
The city's FAQ lets you build a shed or playhouse under 200 square feet with no utility connections without a construction permit. Height and placement rules still apply.
“You can build a detached shed or playhouse if it is under 200 square feet and has no electrical, plumbing, or mechanical connections without a construction permit. Height and location requirements do apply.”
The Homeowners Guide puts the line at 200 square feet or less, and points to the zoning code's accessory building rules.
“Detached accessory buildings or structures 200 square feet or less do not require a permit but must meet certain requirements Chapter 30 - General Site Development Standards (see 11-30-17).”
What the site plan must show
Any application for a new building or structure carries a plot plan.
“Permit applications with new buildings or structures must include a plot plan. A plot plan is a drawing of the lot showing the following:”
The property lines on every side. The street-side line usually sits a few feet behind the sidewalk, not at it.
“Location of property lines on all sides (street side property lines will vary from 3 to 6 feet behind the sidewalk)”
Every building, new and existing, with its distance to the property lines.
“All new and existing buildings on the lot with distance to property lines”
The area of the lot and of each building.
“Total square footage of the lot, existing buildings, and new buildings”
Plans for additions and patios are drawn to scale.
“Additions, remodels, casitas, patios, pools, garage and carport conversions require plans drawn to scale.”
Mesa's zoning checklist for single-family homes, written for new houses, asks a site plan to carry the setbacks, fences, right-of-way, easements and utility lines.
“Dimensioned scalable site plan including all setbacks to property lines, fences, and right-of-way measurements. Additionally, show location of easements, utilities (water, sewer, electric, gas), and septic system if applicable.”
Who may draw the plan
None of the pages we read says who must draw the plot plan, and none asks for a survey. The single-family zoning checklist only says that a sheet carrying a professional's seal must show it legibly.
“Sheets with Arizona professional registrant seals require legible seals and signatures.”
The Homeowners Guide says an owner-occupied project may not need a licensed contractor, and points to the state law that decides it.
“Owner-occupied residential projects may not require a licensed person do the work; verify requirements online at https://www.azleg.gov/ars/32/01121.htm.”
Where to file
Everything is filed electronically.
“All permit applications, plan review, documents, and approvals are electronic.”
Applications and plans go in through the city's DIMES system.
“Create an account and Apply for a Permit online through the DIMES system”
Before you file
Lot lines are drawn from county GIS records. This is not a boundary survey. Some permit offices require a stamped plan or a survey. Check with yours first. The permit office is City of Mesa Development Services, Permit Services. Rules change: the quotes above are what the city's pages said on November 19, 2026.