Permit guide
Site plan for a permit in Oklahoma City, OK
What Oklahoma City's own pages say about sheds, decks and the site plan that goes with the permit, quoted word for word with a link to each page. Then type your address and draw yours to scale for $29.
Can you use our sheet here?
Oklahoma City's pages do not say who must draw the site plan and do not ask for a survey. A retaining wall over 36 inches needs an engineer's stamped design, and pier-and-grade or post-tension foundations and structural members spanning over 30 feet need a licensed engineer.
Do you need a permit for a shed in Oklahoma City?
The city's general rule is that building, altering, enlarging, moving or demolishing any house or accessory structure takes a permit. For a backyard shed, the Development Center's FAQ says only that there may be restrictions and a permit may or may not be required, and that any permit must be issued before the shed is built or moved onto the lot. None of the pages we read gives a size below which a shed is exempt. Write to the Development Center (developmentcenter@okc.gov) with the shed's size and spot before you build.
What an Oklahoma City site plan should carry
The residential checklist, written for new homes, add-ons and remodels, asks for a site plan drawn to scale with the property lines and their lengths, the easements, the right-of-way and a north arrow, plus the new building's spot with its distance to each property line, and the address and legal description. A fence permit asks for the same site plan with each fence section labelled for length. Our sheet draws the lot from the county's parcel record, to scale, with each side's length, the north arrow and the distances from what you place to each lot line. You add the legal description and any easement you know of.
Who can draw it
None of the pages we read says who must draw the site plan, and none asks for a survey. A homeowner can apply for a permit for work they do themselves; otherwise a licensed contractor applies. The checklist names an Oklahoma licensed engineer only for parts of the structure: pier-and-grade or post-tension foundations, and structural members spanning more than 30 feet. A retaining wall taller than 36 inches needs an engineer's stamped design. Electrical, plumbing and heating work must be done by licensed contractors.
Filing
Permits are filed online at okc.gov/access, or in person at the business center at 420 W. Main Street. Upload every file as a PDF, combined into one where you can. The city's submittal standards ask for plans drawn to scale and fully dimensioned, text at least 10 point when printed, plan sheets in landscape, a clear 3 by 3 inch stamp space in the same corner of every page and a 6 by 6 inch space on the cover sheet. Our Oklahoma City sheet prints on 11 by 17 inch paper, in landscape, with text of 12 point or more and a blank 3 by 3 inch space in its upper right corner. The 6 by 6 inch space does not fit on it, so our sheet cannot be the cover sheet: put a separate cover page in front of it with that space left clear. We do not supply the cover page.
What needs a permit in Oklahoma City
Oklahoma City asks for a permit to build, alter, enlarge, move or demolish any house or accessory structure.
“Permits are required when you construct, alter, repair, enlarge, move or demolish any primary or accessory structure.”
For a backyard shed, the Development Center's FAQ says a permit may or may not be required, and any permit must be issued before the shed is built or moved on site.
“Yes, there may be some restrictions and a permit may or may not be required.”
If one is required, it comes first.
“If a permit is required it must be issued prior to any structure being built or moved on site.”
What the site plan must show
The residential checklist (for new homes, add-ons and remodels) asks for a site plan drawn to scale with the property lines and their lengths, easements, the right-of-way and a north arrow.
“Detailed site plan drawn to scale with dimensioned property lines, easements, and right-of-way, and North arrow marked.”
Where the new building sits, with its distance to each property line.
“Proposed location of the home on property with distances to each property line.”
The address and legal description.
“Property address and legal description.”
A fence plan shows the fence on the lot with each section's length.
“Proposed location of the fence on property with sections labeled for length.”
Who may draw the plan
None of the pages we read says who must draw the site plan, and none asks for a survey. The residential checklist lets a homeowner apply for work they do themselves.
“A licensed contractor is required to submit for permit unless performed by the homeowner.”
An Oklahoma licensed engineer is named for the structure only in some cases, such as members spanning more than 30 feet.
“Oklahoma licensed engineers design for structural members with spans exceeding 30 feet.”
Sheet size
Every page of a plan set keeps a clear 3 by 3 inch space for the city's stamp, in the same corner on every page.
“A minimum of 3x3-inch stamp space required on all pages, in the same corner quadrant throughout each set.”
The cover sheet keeps a clear 6 by 6 inch stamp space.
“A minimum of 6x6-inch stamp space required clear on cover sheet.”
Plans are drawn to scale, fully dimensioned and legible.
“Plans must be drawn to scale, fully dimensioned, and legible.”
Printed text is at least 10 point.
“Text print must be a minimum of 10pt font when printed.”
Plan sets are turned to landscape.
“All documents must be uniformly oriented. Landscape for plan sets and portrait for documents.”
Where to file
Permits are filed online at okc.gov/access or in person at the Development Center's business center.
“Submit your permit and files at www.okc.gov/access or visit us in person at 420 W. Main Street, 1st floor Oklahoma City, OK 73102.”
Files go in as PDF, combined into one file where possible.
“All files should be uploaded as PDF.”
Before you file
Lot lines are drawn from county GIS records. This is not a boundary survey. Some permit offices require a stamped plan or a survey. Check with yours first. The permit office is City of Oklahoma City Development Center. Rules change: the quotes above are what the city's pages said on November 19, 2026.