Site plan for a permit in Palm Coast, FL
What Palm Coast's own pages say about sheds, decks and the site plan that goes with the permit, quoted word for word with a link to each page. Then type your address and draw yours to scale for $29.
Can you use our sheet here?
For a shed or deck, Palm Coast's pages do not say who must draw the site plan; the city asks for a site plan or survey. Construction drawings are stricter: a shed over 120 square feet and other accessory structures need engineer-sealed plans, and an addition needs surveys during construction.
Do you need a permit for a shed or deck in Palm Coast?
A shed of 120 square feet or less needs no permit, as long as it is not in the 100-year floodplain and has no concrete; you sign the city's shed acknowledgement in the online portal before you put it up. A larger shed needs a permit. Every deck needs a permit, whatever its size, and so do pergolas, gazebos and other accessory structures. A fence at a house or townhouse needs no permit if it meets the fence rules, though you still sign an acknowledgement. Additions need a permit and a foundation survey before the walls go up. An attached addition over 300 square feet also needs a final survey before its final inspections; a detached addition, such as a garage or ADU, needs a final survey at any size.
Where a shed can go
The city's shed rules (Land Development Code 4.01.07, quoted on the building page) allow one shed per lot, behind the front of the house and outside every easement. A shed up to 100 square feet may sit 5 feet from an interior side or rear lot line. A larger shed must sit at least 10 feet from the rear line and meet the side setbacks of your zoning district. No shed may be taller than 12 feet. If you live under a homeowners association, its rules may be stricter.
What a Palm Coast site plan should carry
For a deck or accessory structure, the city asks for a site plan or survey showing every existing and proposed structure and its distance to the lot lines. For a shed over 120 square feet it lists the shed's size, location, setbacks and dimensions, and every existing structure. Our sheet draws the lot from county GIS parcel records, to scale, with each side's length and the distances from what you place to each lot line, on an 11 by 17 inch page, the smallest the online system takes. You add the house, the shed or deck, and anything else already on the lot. Before you buy anything, check the city's records search: it may already hold a site plan or survey for your lot.
Who can draw it
None of the pages we read says who must draw the site plan. The city asks for a survey or a site plan and does not say the site plan must come from a surveyor. The construction drawings are a separate requirement and stricter: a shed over 120 square feet needs engineered drawings signed and sealed, accessory structures need construction plans sealed by a Florida engineer, and a deck needs either a complete framing plan that meets the code's deck standards or an engineer's seal. If your project is an addition, expect the surveys during construction as well.
What needs a permit in Palm Coast
Every deck needs a permit, whatever its size or height and whether or not it is attached to the house.
“A permit is required for all decks in Palm Coast regardless of area, height above the ground and whether or not it is attached or detached from the home.”
A shed over 120 square feet needs a permit.
“A Shed GREATER than 120 sq. ft. will continue to require a permit”
Pergolas, gazebos, patio covers and other residential accessory structures need a permit.
“Accessory structures are regulated by the Florida Building Code and DO require a permit to ensure compliance with state and local building code, land use and zoning regulations and the City's design wind speed of 120 m.p.h.”
A fence at a one- or two-family house or townhouse needs no permit if it meets the city's fence rules, but the owner signs an acknowledgement of those rules first.
“Effective June 10, 2021, a permit is not required for the installation of a fence, however, an acknowledgement of the City Land Development Code regulations is required to be signed prior to installation.”
An addition also needs surveys during construction: a foundation survey before the walls go up, then a final survey before the final inspection. For an attached addition the final survey applies over 300 square feet; for a detached addition, such as a garage or ADU, it applies at any size.
“A foundation survey must be submitted prior to any vertical construction (if not previously on file)”
An attached addition over 300 square feet needs a final survey before its final inspections.
“A final survey is required prior to the final inspections for any addition greater than 300 square feet.”
A detached addition, such as a garage or ADU, needs a final survey before its final inspections whatever its size.
“A foundation survey must be submitted prior to any vertical construction. (if not previously on file) A final survey is required prior to the final inspections. A termite certificate is required prior to the issuance of the certificate of occupancy.”
Sheds that need no building permit
A shed of 120 square feet or less needs no permit, but the owner signs an acknowledgement of the city's shed rules before installing it.
“Effective July 8, 2021, a permit is not required for the installation of a shed 120 sq. ft. and under, however, an acknowledgement of the City Land Development Code regulations is required to be signed prior to installation.”
Concrete under the shed needs a permit of its own.
“If you are adding any concrete a permit WILL BE required for that portion of the work.”
The exemption does not apply in the 100-year floodplain.
“Residential sheds 120 sq. ft. and less (or larger ones) located within the 100 year floodplain are not exempt from permit.”
What the site plan must show
For a deck or accessory structure: every existing and proposed structure, with its distance to the lot lines.
“Site plans/survey - include all existing and proposed structures and setbacks to property lines. Check our files - https://records.palmcoastgov.com/”
For a shed over 120 square feet: its size, location, setbacks and dimensions.
“Proposed size, location, setbacks and dimensions”
And every existing structure on the lot.
“All existing structures”
Who may draw the plan
None of the pages we read says who must draw the site plan. The city asks for a survey or a site plan, and points to its records search, which may already hold a site plan for the lot.
“Survey / site plan Check our files - https://records.palmcoastgov.com/”
The construction drawings are separate. A shed over 120 square feet needs engineered drawings signed and sealed.
“Engineered signed and sealed drawings”
A deck's framing plan may go without an engineer if it covers every deck standard in the code; otherwise a Florida engineer seals it.
“Plans do not necessarily require engineering provided the contractor can provide a complete deck framing plan that addresses all construction standards listed in Section R507.1 through R507.8.2 based on a 40 p.s.f. minimum live load and 10 p.s.f. minimum dead load.”
Sheet size
Plans filed online are no smaller than 11 by 17 inches and no larger than 36 by 48.
“Plans are not to exceed 36 x 48 or be designed less than 11” x 17 for smaller scale projects.”
Each drawing goes up as its own one-page PDF.
“Each drawing file must be on one page only”
Where to file
Permits go in through the city's online portal or in person at City Hall, and the same route is kept until the permit is issued.
“The permit may be submitted in person at City Hall or through our online permitting process.”
The application and owner-builder affidavit are generated for signature in the portal.
“The permit application and owner builder affidavit will be generated for signature when submitting through the online permitting portal.”
Before you file
Lot lines are drawn from county GIS records. This is not a boundary survey. Some permit offices require a stamped plan or a survey. Check with yours first. The permit office is City of Palm Coast Building Division. Rules change: the quotes above are what the city's pages said on November 19, 2026.