Site plan for a permit in Phoenix, AZ
What Phoenix's own pages say about sheds, decks and the site plan that goes with the permit, quoted word for word with a link to each page. Then type your address and draw yours to scale for $29.
Can you use our sheet here?
Phoenix's pages do not say who must draw a plot plan for a shed, deck, fence or addition, and none asks for a survey. Ask the city before you rely on that; engineer or architect seals apply to the structure's design.
Do you need a permit for a shed in Phoenix?
Size and utilities decide it. A detached shed of 200 square feet or less with no power, water or gas needs no building permit, but it still has to meet the zoning setbacks from the property lines. A larger shed, a room addition, or a fence taller than three feet needs a permit. An uncovered deck no more than 30 inches above the ground, not over a basement or story below and not part of an accessible route, is on the city's list of work that needs no permit. The plot plan example's lot coverage table counts detached accessory structures, so it helps to draw even an exempt shed on the lot before you build.
What a Phoenix plot plan should carry
Phoenix calls the site plan a plot plan. The city's example asks for a drawing to scale with a north arrow, every property line labelled with its length, the streets and alleys next to the lot, easements, the buildings that stay and the ones you add, the setbacks your zone requires and the ones you provide, fences and walls with their heights, and a lot coverage table. Our sheet draws the lot from the county's parcel record, to scale, with each side's length, the lot area, the north arrow and the distances from what you place to each lot line. You add the structure, easements, fences, the setbacks your zone requires and the coverage figures. The city's residential plan submittal checklist says the plot plan scale should be no smaller than 1 inch to 20 feet. The same 2019 checklist also asks for each line's bearing; those are on the recorded subdivision plat.
Check your zoning first
The plot plan example tells you to confirm the lot's zoning, required setbacks and allowed lot coverage with the city's Zoning section before you draw; it gives the address zoning@phoenix.gov for written questions. The city's My Community Map shows the zoning district.
Who can draw it
Phoenix's pages do not say who must draw a plot plan, and none of the pages we read asks for a survey for a shed, deck, fence or addition. The plot plan example sends you to the recorded subdivision plat for the lot's dimensions and easements. The submittal checklist ties seals from an engineer or architect to the design of the structure. On the fence application the owner takes responsibility for knowing where the property lines are, and may hire a land surveyor if they want one.
What needs a permit in Phoenix
Phoenix's list of home projects that need a permit starts with any new building, including a detached structure over 200 square feet.
“All new residential buildings, including detached structures larger than 200 square feet”
Room additions are on the same list.
“Room additions”
So are fences over three feet tall.
“Fences taller than three feet”
The city's list of work exempt from a permit (revised July 2014) leaves out low platforms, and its commentary counts uncovered decks among them: a deck with no roof that stands no more than 30 inches above grade needs no building permit.
“Decks, sport courts and other similar uses with no roof covering shall also be included in this exception.”
Sheds that need no building permit
A detached structure of 200 square feet or less with no utilities needs no permit, but it must still meet the zoning setbacks and the approved plat or site plan.
“Detached structures without utilities 200 square feet or less. (Minimum zoning setbacks from property line must be maintained and approved plat/site plan must be approved.)”
Running power or water to an exempt shed takes a permit for that work.
“If utilities are provided to a detached accessory structure exempt from permit, a permit is required for the installation of the utilities.”
What the site plan must show
The city's single-family plot plan example (revised July 2026) says the plan is drawn to scale.
“The plot plan must be drawn to scale.”
It asks for a north arrow and the scale.
“North arrow & scale (suggested scale 1ā = 20')”
Every property line, labelled and dimensioned.
“Show, label, and dimension all property lines (check plat map if available)”
The streets and alleys next to the lot.
“Label adjacent streets and alleys”
Every easement.
“Show, label, and dimension all easements”
The buildings that stay and the ones you propose, with their sizes.
“Show, label, and dimension all existing structures to remain and all proposed structures”
The setbacks your zone requires and the ones your plan provides.
“Show, label, dimension, and list the required and provided building setbacks”
Fences, walls and gates, with their heights.
“Show the locations and heights of existing and proposed fences, walls, and gates”
And the lot coverage: the lot area, what your zone allows, and what you propose, counting detached accessory structures.
“Provide a Lot Coverage Table and Lot Coverage Totals Table:”
The older residential plan submittal checklist (revised March 2019) also asks for the bearing of each property line.
“Provide plot plan showing all property line dimensions and bearings along with proposed and existing construction, easements, streets, alleys, and directional arrows.”
Who may draw the plan
None of the pages we read says who must draw the plot plan, and none asks for a survey. The plot plan example points you to the recorded subdivision plat for the lot's dimensions and easements.
“Property dimensions and easements can be found on the recorded subdivision plat.”
The submittal checklist ties seals to the design of the structure: an engineer or architect who designs it seals the sheets they designed.
“All professional engineers and architects involved in the design of the structure are to seal the related sheets and details.”
An owner who will live in the building may act as the general contractor.
“Arizona Licensed Contractors shall be used for all work and shall be listed on the application form and permit unless the owner, who will occupy the building, is acting as the general contractor.”
On the fence application the owner signs that finding the property lines is their job; hiring a land surveyor for it is the owner's choice.
“I understand that, at my own expense, I may hire a registered land surveyor to locate the existing property lines.”
Sheet size
The same checklist says the plot plan scale should be no smaller than 1 inch to 20 feet.
“Plot plan scale should be no smaller than 1ā = 20ā.”
Where to file
Plans go in online through SHAPE PHX, with the plot plan uploaded as a PDF.
“Electronic submittal is through SHAPE PHX (https://shapephx.phoenix.gov/s/). Upload a PDF copy of the plot plan with the rest of the residential permit submittal requirements”
Before you file
Lot lines are drawn from county GIS records. This is not a boundary survey. Some permit offices require a stamped plan or a survey. Check with yours first. The permit office is City of Phoenix Planning and Development Department, Residential Building. Rules change: the quotes above are what the city's pages said on November 19, 2026.