Permit guide
Site plan for a permit in Portland, OR
What Portland's own pages say about sheds, decks and the site plan that goes with the permit, quoted word for word with a link to each page. Then type your address and draw yours to scale for $29.
Can you use our sheet here?
For a shed or deck, Portland does not require a survey for an ordinary lot, and anyone can draw deck plans. Our sheet cannot stand in for a survey on a street without a curb, a steep lot or a flood hazard area, or for an addition's structural plans.
Do you need a permit for a shed in Portland?
Not for a small one. A non-habitable accessory structure of 200 square feet or less, measured inside the exterior walls, needs no building permit, though it may need a zoning permit; over 200 square feet, or taller than 15 feet, it needs a building permit. A habitable structure needs a building permit at any size. On a lot over 2 acres, a structure under 400 square feet set at least 20 feet from property lines and other structures needs no building permit. A deck needs a permit once it stands more than 30 inches high, and a fence above 7 feet. All work must still follow the zoning rules, even when no building permit is needed.
What a Portland site plan should carry
Portland's site plan shows the property lines with their lengths, the lot's area in square feet, the address, adjacent streets and any easements, a north arrow, grade elevations, the distance from each building to the property lines, existing and proposed buildings and paving with their size, sewer, water and stormwater, driveways and parking, and the public right-of-way, which every site plan must include. It goes on a sheet at least 11 by 17 inches, the same size as the rest of the drawings, drawn at a scale of 1 inch = 10 feet or larger, in black and white, with dimensions and notes in type of 12 point or larger. Choose 11 by 17 inch paper for our sheet. It draws the lot from the county's parcel record, to scale, with each side's length, the lot area, a north arrow and the distances from what you place to each lot line. Print it in black and white, and add the grades, utilities, right-of-way and driveway. The city's Sample Site Plan cannot be used for a lot in a floodplain or an environmental or river overlay zone.
Who can draw it
For a deck, Portland says anyone can draw the plans. None of the pages we read says who must draw the site plan for a shed or an addition, and none requires a survey for an ordinary lot. A survey comes in at the edges: on a street without a curb the property line comes from a survey or an existing survey marker, the city recommends a survey for a steep lot, and in a flood hazard area a survey by a licensed surveyor or engineer may be required. Our sheet cannot stand in for any of those. Most additions need structural plans from an Oregon architect or engineer; that is the structural set, not the site plan.
How to file
Apply online with a completed application. The site plan, architectural plan and structural plan go in together, all on the same sheet size.
What needs a permit in Portland
Portland's garage, shed and accessory structure page says a building permit is needed for an accessory structure over 200 square feet, measured inside the exterior walls.
“Over 200 square feet (measured from the interior of exterior walls)”
Or one taller than 15 feet.
“and/or taller than 15 feet (measured from the grade plane to the average height of the highest roof surface)”
A deck needs a permit once it stands more than 30 inches high.
“Build a deck more than 30 inches high”
A fence needs one above 7 feet.
“Put up a fence more than seven feet high”
Sheds that need no building permit
A non-habitable structure of 200 square feet or less needs no building permit, though it may need a zoning permit.
“A building permit is not needed, but you may need a zoning permit.”
What the site plan must show
Every site plan carries the public right-of-way, whatever the project.
“Public right-of-way information. All site plans must include public right-of-way information, regardless of your project's scope.”
The accessory structure page lists the property lines with their lengths.
“Property lines, with dimensions”
The lot's area in square feet.
“Total area (in square feet) of the lot”
A north arrow.
“North arrow (arrow pointing to the north direction)”
The distance from each building to the property lines.
“Distance between buildings and property lines”
Who may draw the plan
For a deck, the city says anyone can draw the plans. None of the pages we read says who must draw the site plan for a shed or an addition.
“Anyone can draw the plans, but the drawings have to follow rules about project information and how the drawings present that information.”
On a street without a curb, the property line comes from a survey or an existing survey marker.
“Streets without a curb. Get a survey or locate an existing survey marker to identify the property line location.”
On a steep lot the city recommends a survey.
“A survey is recommended for steeply sloping lots to ensure accuracy.”
In a flood hazard area, a survey by a licensed surveyor or engineer may be required.
“A survey prepared by a licensed surveyor or professional engineer may be required.”
Most additions need structural plans from an Oregon architect or engineer; that is the structural set, not the site plan.
“Most additions require structural plans drawn by an Oregon-licensed architect or engineer.”
Sheet size
The site plan goes on a sheet at least 11 by 17 inches, the same size as the other permit drawings.
“You must draw your site plan on an 11-inch x 17-inch or larger sheet. All your permit drawings should be the same sheet size.”
It is drawn at 1 inch = 10 feet or larger.
“Draw your site plan to a scale of 1 inch = 10 feet or larger.”
In black and white, legible and reproducible.
“Plans must be in black and white, clearly legible, and reproducible.”
The additions page's site plan checklist sets the smallest text size: dimensions and notes at 12 point or larger.
“Dimensions and notes must be 12 point font minimum”
Where to file
Applications are filed online.
“Apply online with a completed application”
Before you file
Lot lines are drawn from county GIS records. This is not a boundary survey. Some permit offices require a stamped plan or a survey. Check with yours first. The permit office is Portland Permitting & Development. Rules change: the quotes above are what the city's pages said on November 19, 2026.