Site plan

Permit guide

Site plan for a permit in Sacramento, CA

What Sacramento's own pages say about sheds, decks and the site plan that goes with the permit, quoted word for word with a link to each page. Then type your address and draw yours to scale for $29.

Can you use our sheet here?

Sacramento's pages do not say who must draw a site plan for a shed, deck or fence, and none asks for a survey. If the project has structural framing, such as a patio cover or large outbuilding, ask the city whether a licensed designer is needed.

Do you need a permit for a shed in Sacramento?

Mostly it comes down to 120 square feet. A one-story detached shed under 120 square feet needs no building permit; at 120 square feet or more it does. The city's two pages put exactly 120 on different sides of the line (the permit page exempts a shed that is not greater than 120 square feet, the handout requires a permit at 120 or greater), so if yours is exactly 120, ask the Building Division in writing before you build. Anything attached to the house needs a permit at any size. A detached deck of 200 square feet or less, no more than 30 inches off the ground at any point, is exempt, and so is a fence up to 7 feet high, though Planning still reviews every new fence. None of these exemptions holds inside a design review or historic preservation district.

Where a shed can go

The building handout leaves setbacks, size, height and lot coverage to Planning and asks you to confirm them before you file. Planning's exemption form for accessory structures (CDD-0025) shows what it checks: the side, street-side and rear setbacks your zone requires, a distance of 4 feet from the house, rear-yard coverage, lot coverage, a height of no more than 18 feet with walls no taller than 10 feet, whether the structure can be seen from the street, and whether its siding and roofing match the house. The setback numbers depend on your zone, which the city's Land Information Lookup app shows. A shed that meets all of these can apply with that form to skip Site Plan and Design Review, but the form still asks for a site plan, building elevations and floor plans.

What a Sacramento site plan should carry

Sacramento's accessory-structures handout asks for plans drawn to scale and fully dimensioned, and sends you to the city's plan intake sheet for the minimum requirements. Its sample site plan marks the floor area of each new structure, the distance from the new structure to each property line and the distances to the other buildings on the lot. The intake sheet also asks for a north arrow and the sewer and water connections, and sets the sheet at no less than 11 by 17 inches with the site plan drawn at no smaller than 1/8 inch to the foot. Our sheet prints on 11 by 17 inches and draws the lot from the county's parcel record, to scale, with each side's length, a north arrow and the distance from what you place to each lot line.

Who can draw it

None of Sacramento's pages we read says who must draw a site plan, and none asks for a survey for a shed, deck or fence. The take-in sheet asks for a licensed professional's stamp only when the scope of work requires one, and does not say which accessory work does. An owner can take out the permit as an owner-builder. If your project includes structural framing, such as a patio cover or a large outbuilding, ask the Building Division in writing whether its plans need a licensed designer before you file.

What needs a permit in Sacramento

The accessory-structures handout says a detached structure of 120 square feet or more needs a building permit.

“Any detached structure 120 ft² in floor area or greater”

The city's page, read November 19, 2026

Anything attached to the house needs one at any size.

“Any structure attached to the main dwelling, regardless of size”

The city's page, read November 19, 2026

Sheds that need no building permit

The building division's permit page exempts a one-story detached structure of up to 120 square feet.

“One-story detached accessory structures, provided the floor area is not greater than 120 square feet.”

The city's page, read November 19, 2026

A low, detached deck of 200 square feet or less is exempt too.

“Decks not exceeding 200 square feet in area, that are not more than 30 inches above grade at any point, are not attached to a dwelling and do not serve the exit door required by Section R311.2 of the California Residential Code.”

The city's page, read November 19, 2026

So is a fence up to 7 feet high, though Planning still reviews fences.

“Fences not over 7 feet high. (3)”

The city's page, read November 19, 2026

None of these exemptions applies inside a design review or historic district.

“* Unless within a design review or historic preservation district (or a historic landmark).”

The city's page, read November 19, 2026

What the site plan must show

Plans for an accessory structure, the site plan among them, are drawn to scale and fully dimensioned.

“plans must be drawn to scale, be fully dimensioned, legible, and shall include the following as necessary to perform a thorough plan review: Cover Sheet, Site Plan, Foundation Plan, Floor Plan, Elevations, Cross-Sections, and Roof Framing Plan”

The city's page, read November 19, 2026

The handout's sample site plan asks for the distance from the new structure to each property line.

“Specify all setback distances to property lines proposed structure”

The city's page, read November 19, 2026

The distances to the other buildings on the lot, new and existing.

“Specify all distances to other proposed and existing structures”

The city's page, read November 19, 2026

The floor area of each new structure.

“Specify square footage area of all proposed structures”

The city's page, read November 19, 2026

The accessory-structures handout sends sheds and other accessory work to the city's plan intake sheets for the minimum plan requirements.

“See form CDD-0253 or CDD-0312 for minimum plan intake requirements.”

The city's page, read November 19, 2026

The plan intake sheet, which the accessory-structures handout points to for its minimum requirements, asks the site plan for the sewer and water connections and a north arrow.

“Site or Plot Plan shall include: All points of connection (i.e., sewer, and water lines); if present, abandoned septic noted. North arrow and optionally a vicinity map.”

The city's page, read November 19, 2026

Planning's exemption form for accessory structures, which skips Site Plan and Design Review, still asks for a site plan with the elevations and floor plans.

“Plans: A site plan, building elevation plans, and floor plans.”

The city's page, read November 19, 2026

Who may draw the plan

None of the pages we read says who must draw the site plan, and none asks for a survey. The take-in sheet asks for a licensed professional's stamp only when the scope of work requires one.

“Declaration of Designer or licensed professional signed stamp, if the scope of work requires a licensed design professional”

The city's page, read November 19, 2026

An owner can take out the permit and do the work as an owner-builder.

“Property owners and are required by state law to sign an owner-builder verification stating that they are actually doing their own work”

The city's page, read November 19, 2026

Sheet size

Plans are at least 11 by 17 inches.

“No less than 11” x 17””

The city's page, read November 19, 2026

A site plan is drawn at no smaller than 1/8 inch to the foot.

“Site and Civil Plans: no less than 1/8”=1’”

The city's page, read November 19, 2026

Where to file

Zoning comes first: you confirm the setbacks and size limits with Planning before you file.

“It is required for the applicant to verify that all planning/zoning regulations are compliant prior to filing for a building permit.”

The city's page, read November 19, 2026

Plans go in through the city's electronic plan check.

“ELECTRONIC PLAN CHECK* IS REQUIRED FOR ALL PLAN REVIEW SUBMITTALS AND RESUBMITTALS.”

The city's page, read November 19, 2026

Before you file

Lot lines are drawn from county GIS records. This is not a boundary survey. Some permit offices require a stamped plan or a survey. Check with yours first. The permit office is City of Sacramento Community Development, Building Division. Rules change: the quotes above are what the city's pages said on November 19, 2026.

Draw your Sacramento site plan