Site plan

Permit guide

Site plan for a permit in Smyrna, GA

What Smyrna's own pages say about sheds, decks and the site plan that goes with the permit, quoted word for word with a link to each page. Then type your address and draw yours to scale for $29.

Can you use our sheet here?

None of Smyrna's pages we read says who must draw the site plan for a shed, deck, porch or addition, and none asks for a survey. Engineered construction plans, a separate set, must be sealed by a Georgia professional engineer.

Do you need a permit for a shed or deck in Smyrna?

A detached shed, gazebo or other accessory structure needs a permit only when it is larger than 200 square feet or taller than one story. Smaller ones need no permit, but the zoning code still allows one accessory structure per lot, whatever its size, and the zoning rules still apply. Every new deck and every deck replacement needs a permit, and so does any addition attached to the house, including an attached garage or carport. Work started before the permit is issued can cost double fees.

What the site plan should carry

Smyrna's plan requirements sheets (dated July 2026) list four items for the site plan of an accessory structure, deck, porch or addition: the existing site and its property lines; where the new structure goes and its dimensions; the setbacks; and the lot's impervious coverage as a percentage. The city's worksheet for that last item counts the house, garage, porch, shed, deck, driveway, sidewalks, patio and pool. Our sheet draws the lot from county GIS parcel records, to scale, with each side's length, the distances from what you place to each lot line, and the lot's area and impervious coverage. Check your zoning district's maximum coverage on the city's mapping page before you file.

Who can draw it

None of the pages we read says who must draw the site plan, and none asks for a survey for a shed, deck, porch or addition. The homeowner can take out the permit if the house is their current permanent residence and in their legal name, and if they have not sold or leased a property they renovated or built themselves within the prior 24 months. For the construction plans, a separate set from the site plan, the city says they can be drawn by computer or by hand, and that any engineered plans must be sealed by a Georgia professional engineer.

Where to file

Applications, plans and supporting documents go in online on the city's permit portal at smyrnaga.portal.opengov.com. The fee is $7 per $1,000 of construction cost, plus a 10% records fee and a $15 technology fee, with a minimum of $125.

What needs a permit in Smyrna

New decks and deck replacements need a permit, as do building additions.

“New Decks and Deck Replacements;”

The city's page, read November 19, 2026

Additions attached to an existing structure need a permit.

“Building Additions (attached to an existing structure);”

The city's page, read November 19, 2026

Sheds that need no building permit

A detached shed or other accessory structure needs a permit only when it is larger than 200 square feet or taller than one story.

“Accessory Structures are detached structures. A permit is required when larger than 200 s.f. OR taller than one story.”

The city's page, read November 19, 2026

Whatever its size, the zoning code allows one accessory structure per lot.

“Each lot is allowed one Accessory Structure per City zoning code, regardless of size.”

The city's page, read November 19, 2026

What the site plan must show

The site plan for a shed or other accessory structure shows the lot lines and what is on the lot now, where the new structure goes and its size, the setbacks, and the lot's impervious coverage as a percentage.

“Zoning Requirements – Site Plan ▪ Existing Site Conditions and Property Lines ▪ Proposed Location and Dimensions of Accessory Structure ▪ Property Setbacks ▪ Impervious Lot Coverage Calculation (%)”

The city's page, read November 19, 2026

A deck or porch site plan carries the same items for the deck or porch.

“Zoning Requirements – Site Plan ▪ Existing Site Conditions and Property Lines ▪ Proposed Location and Dimensions of Deck/Porch ▪ Property Setbacks ▪ Impervious Lot Coverage Calculation (%)”

The city's page, read November 19, 2026

And an addition site plan carries them for the addition.

“Zoning Requirements – Site Plan ▪ Existing Site Conditions and Property Lines ▪ Proposed Location and Dimensions of Addition ▪ Property Setbacks ▪ Impervious Lot Coverage Calculation (%)”

The city's page, read November 19, 2026

Who may draw the plan

None of the pages we read says who must draw the site plan or asks for a survey. The homeowner can obtain the permit if the house is their current permanent residence in their legal name.

“A: A permit can be obtained by a state-licensed general contractor or the homeowner. In order for the homeowner to obtain a permit, the property must be their current permanent residence and be listed in their legal name.”

The city's page, read November 19, 2026

A homeowner permit is also refused to an owner who has sold or leased a property they renovated or built themselves in the prior 24 months.

“Owners may obtain a Homeowner Permit if the subject property is their legal permanent residence and the owner has not sold or leased a previously self-renovated/-constructed property within the prior 24-month period.”

The city's page, read November 19, 2026

For the construction plans, a separate set from the site plan, the city says they may be drawn by computer or by hand.

“Construction plans can be drawn by computer or hand, and must include all required information”

The city's page, read November 19, 2026

Plans that are engineered carry a Georgia professional engineer's seal.

“Engineered plans must be signed and sealed by a state-registered professional engineer”

The city's page, read November 19, 2026

Where to file

Applications and plans are filed online on the city's OpenGov permit portal.

“Permit applications and supplemental documents are submitted online: smyrnaga.portal.opengov.com.”

The city's page, read November 19, 2026

The fee is $7 per $1,000 of construction cost plus a 10% records fee and a $15 technology fee.

“Permit Fees are based on construction cost: $7 per $1000 of construction cost + 10% Records Fee + $15 Technology Fee”

The city's page, read November 19, 2026

The minimum fee is $125.

“Minimum Permit Fee: $125 (= $100 + 10% Records Fee + $15 Technology Fee)”

The city's page, read November 19, 2026

Before you file

Lot lines are drawn from county GIS records. This is not a boundary survey. Some permit offices require a stamped plan or a survey. Check with yours first. The permit office is City of Smyrna Community Development Department. Rules change: the quotes above are what the city's pages said on November 19, 2026.

Draw your Smyrna site plan